This project consisted of painting exposed metal deck ceilings, re-painting of drywall, trim, columns and electrostatic painting of the center handrail/stair system pictured above. The entire job was completed in phases in order to allow the museum to stay open and operational throughout the duration of the project.
The general contractor was Elzinga and Volkers.